ACT Healthy Waterways
ACT Healthy Waterways LM013
Huon was involved in the construction of Asset LM013 of the ACT Healthy Waterways initiative between Dixon Drive and Cotter Road in Holder.
The works included:
- Earthworks
- Stormwater drainage with sediment basin outlet structure
- Wetland outlet structure and low flow diversion structure
- Flexible pavement construction
- Minor concrete works
- Landscaping works
Overall project value
$2.6m
Location
Holder ACT
Client
Construction Control
Completed
June 2018