ACT Healthy Waterways

ACT Healthy Waterways LM013

Huon was involved in the construction of Asset LM013 of the ACT Healthy Waterways initiative between Dixon Drive and Cotter Road in Holder.

The works included:

  • Earthworks
  • Stormwater drainage with sediment basin outlet structure
  • Wetland outlet structure and low flow diversion structure
  • Flexible pavement construction
  • Minor concrete works
  • Landscaping works

Overall project value

$2.6m

Location

Holder ACT

Client

Construction Control

Completed

June 2018

Close